I started on my list tonight. I was overdue for an oil change, that is now done. I also cleaned up and repainted the rear control arms, shocks and rear diff after Death Valley sandblasted it all.
Still remaining on the list are:
-sand and repaint rock sliders
-install HID ballasts and bulbs into my Hella Micro DE fog lights
-change the front & rear diff fluids, xfer case and transmission fluids with synthetic
-complete clay bar, polish and wax detail
non-car related includes:
-replace flickering kitchen flourescent light
-finish my backyard sprinkler system (install three new electric solenoid valves to replace leaking ones and three pressure reducers for drip, plus running the drip lines
-trim out windows in house. (sheetrock window surrounds aren't cutting it anymore)
-cut down two medium-sized liquid amber trees, one medium aspen tree and one small aspen tree
The house list is infinitely long, but those will cover the next five months or so.